WHBC Mission Trip Blog

Saturday, June 21, 2008

Attention Construction Team: Here are some pictures from the upper level of the Grace Baptist Black Sea Camp. A team of three from North and South Carolina have been here for three weeks working with some of the older boys from the Grace Shelter. In that length of time they have completed the studding out (see below) and the particle board on one 8 unit cabin and are starting on the second one. As you can see these will have exterior entrances into the bedrooms with individual baths at the back of the bedroom. The men also strung all of the interior wiring with the help of one Ukrainian man, Andrew.


Here is a shot of some of the power tools that are on hand. They are purchased in Odessa or Uzhiney by teams and left for the next group to use. While there is still construction needed on the upper camp, there is much finish work and maintenance to be done on the older lower camp and the area that fronts the Black Sea.
More pictures to come in the next installment of the Missions Blog!






0 Comments:

Post a Comment



<< Home